Publication
The main goal of the 3(rd) Rhone Correction project is to improve the flood protection in the Upper Rhone River basin. In this context, the MINERVE project aims contributing to a better flow control during flood events, taking advantage from the multireservoirs system existing in the watershed. For this purpose, a hydrometeorological forecast model has been developed as well as a decision support tool for the hydropower plants preventive management.
Pejman Abedifar, Seyed Javad Kashizadeh
Giovanni De Cesare, Stéphanie Joëlle André, Alexandre Philippe Louis Antoine Fourrier