The 3rd correction of the Rhone River (R3) is the largest flood protection project in Switzerland so far. Covering a length of 162 km, it aims to protect some 100,000 people and prevent flood damages, which could raise up to 10 billion CHF for major events ...
This paper presents a digital joinery generation method for whole-timber structures using wood-wood connections. The research is based on a collaboration with a local timber company located in a mountain area [1]. In this context, there is a need to explor ...
This paper presents a new construction of error correcting codes which achieves optimal recovery of a streaming source over a packet erasure channel. The channel model considered is the sliding-window erasure model, with burst and arbitrary losses, introdu ...
In the construction community, underground construction is perceived as being significantly more costly and more energy-consuming than comparable surface construction. Although the literature is scarce, studies that have attempted to quantify this differen ...
The rail link between Geneva Cornavin Station, Eaux-Vives Station and Annemasse (CEVA) is currently under construction including a cut-and-cover tunnel built by slurry walls located in the alluvium of the Foron River. The covered trench cuts the groundwate ...